PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB

PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB Playstation
€10
Payment:
  • Visa
  • MasterCard
  • Paypal
  • Cash
Stock:
7 Available
Condition:
Brand new

you can collect from Drumcondra beside Skylon hotel or the city center.

Product Description:
The Charge & Play 3 Metre Controller Charge Cable allows the gamer to simultaneously charge and play the PS4 or Xbox One wireless controller.
With a long length of 3 meters (10 feet), this allows comfortable gameplay. No more waiting for your controller to charge!

Features:
- Fully compatible with PlayStation 4 (PS4) and Xbox One Controllers for charging and gameplay.
- High-quality USB A to Micro USB B cable is expertly designed and offers a smooth and tight connection to the controller.
- Fast charging.
- Works great on smartphones as well.
- Simultaneously charge and play with the wireless Xbox One or PlayStation 4 (PS4) controller.
- 3 meters (10 feet) long.

More in Playstation
(8,324)
More from this seller
(135)
Shipping:
  • Collection
  • Ireland
  • Europe
  • Rest of world
 
  • Free
  • € 1.00
  • € 5.00
  • € 5.00
Entered/Renewed:

3 years ago

Ad Views:

2,637

  • Report ad
SELL SOMETHING SIMILAR