Electric Patio Heater 650-2000W - 3 Power Heating Levels, Infrared Radiation Heater for Outdoors, Angle Adjustable Freestanding Quartz Bulb Heater with Wall Attachment & Extra Long Lead

Shipping: Nationwide
Delivery: 2-5 days
Condition: Brand New

Our Customer First: Customer satisfaction has always been our pursuit, if you are not happy with this transaction, please do not hesitate
to contact us for help.

Description:


Colour Tower
Indoor/Outdoor usage Outdoor
Power source Corded Electric
Heating method Radiant
Mounting type Standing & Wall Mounting
Electric Heater for Patio: Electric Patio Heater provide warm infrared radiation quickly and equably. Using electric power, no extra greenhouse gases are produced. Perfect to place next to the seating area and around your garden. You may enjoy your outdoors meet-up in all seasons.
Sturdy and Safe Freestanding - The Vertical Patio Heater features a sturdy circular base to provide a stable standing even on windy days. This IPX4 waterproof approved electric patio heater with rub resistance coating is suitable for most of the weather.
3.8m Extra Long Power Lead - In order to let you put our patio heater in the place your need, the heater is designed with an extra-long 3.8m power cable. The extra-long lead reaches EU safety standard and support anywhere you need warm.
3 Power Heating Levels - Our electric heater provides 3 level heating setting, with maximum output is 2000W, able to heat up to 15 square metres. You could easily switch the heating level you need with a button. Suitable for multiple outdoors occasions, such as Courtyards, Garages, Outdoor Travel, Gardens, Terraces, Balconies, and Other Places.
Fully Adjustable - The patio heater is fully adjustable to fit all your needs.






E2A+2278

No offers under the asking price

More in Electric
(736)
Seller:
Feedback:
Location:
Zbiz International
1044 60
Ennis, Clare
More from this seller
(5928)
Shipping:
  • Collection
  • Delivery
  • Post/Courier
  • To be arranged
Payment:
  • Paypal
  • Bank transfer
  • To be arranged
Entered/Renewed:

2 months ago

Ad Views:

197

  • Report ad
SELL SOMETHING SIMILAR